Skip to content
LeapWise
Menu

The FDE method

FDE stands for forward-deployed engineer: our engineers work at your site, build AI into everyday work alongside your people, and are accepted against agreed metrics.

Four stages, each with a gate

  1. 1

    Align on the use case

    1–2 weeks on site

    Output

    Use-case list, success metrics, data and system boundaries

    Gate: No metric written down, no PoC

  2. 2

    Build and launch together

    PoC 2–4 weeks, delivery 4–6 weeks

    Output

    Working system, connectors, evaluation set, acceptance report

    Gate: Below the bar, no launch

  3. 3

    Run in production

    Remote subscription

    Output

    Monthly results report, knowledge operations, model tuning

    Gate: Metrics slip, go back a stage and fix

  4. 4

    Reuse and expand

    Next department, next site

    Output

    Connectors, industry templates and evaluation sets reused

    Gate: Similar use cases get faster each time

Six places where AI projects stall

HurdleWhat it looks likeWhat we do
No defined use caseIt starts with “we need AI” — nobody can say which step it saves or who owns itA use-case workshop: write the success metric first, then build
Data in silosKnowledge is scattered across drawing vaults, file shares, laptops and chat groupsConnect native systems on site, index through file encryption, and keep each person's permissions
Legacy systems without APIsERP, MES and CAD offer no API — only spreadsheet exports and manual entryConnectors plus deterministic write-back, without modifying your core systems
Wrong acceptance yardstickOnly speed gets measured, not accuracy — one wrong answer and nobody trusts itBuild the evaluation set from your real material and put accuracy into the acceptance bar
The business doesn't adopt itThe pilot passes in IT, but no one in the business uses itShip it inside WeCom, Feishu, DingTalk and existing software — no install, no training
Unclear boundariesThe language model is allowed to produce numbers, issue commands or drive equipmentThe model only proposes; parameters, checks and database writes are decided by code and human approval

The model only proposes

The language model understands and explains; numbers, parameters and writes are decided by code and people.

  1. 1

    An employee asks

    in WeCom, Feishu, DingTalk or business software

  2. 2

    Language model

    understands, retrieves, drafts — proposes

  3. 3

    Rules engine

    computes numbers, checks parameters, traceable

  4. 4

    Human approval

    owners confirm high-risk actions; submitter ≠ approver

  5. 5

    Write back

    to ERP, drawing vault, task system — fully audited

Safety and control

Data stays inside
Privately deployed open-weight Chinese LLMs; external APIs can be disabled; the model gateway is the only exit and logs everything.
The model only proposes
Understanding, retrieval and drafting go to the model; calculations, parameter checks and writes to business systems are decided by deterministic code and human approval.
Permissions and separation of duties
Permissions follow the source system, filtered per person; high-risk actions need approval, and the submitter can't approve their own request.
Full audit trail
Every question, call and change is recorded; key figures trace back to the original documents.
Domestic-stack ready
Runs on domestic databases and ARM servers, with offline installers that set up from scratch without internet.

Deployment options

On-premises
In your own data center or servers; data never leaves the company.
Dedicated cloud
On the dedicated or government cloud you choose, scaling as needed.
Hybrid
Sensitive data and models stay local; non-sensitive workloads use cloud resources.

Where people use it

  • WeCom
  • Feishu
  • DingTalk
  • Web
  • Mini programs
  • Embedded in existing software

How we work together

  1. 1

    Validate the use case

    PoC, 2–4 weeks

    A PoC on your real material, with acceptance metrics agreed up front

    Deliverables

    Working PoC, evaluation report, launch plan

  2. 2

    Deliver

    Delivery, 4–6 weeks

    Connect systems, go to production, train the business users

    Deliverables

    Production system, connectors, evaluation set, acceptance report

  3. 3

    Operate

    Remote subscription

    Knowledge operations, results monitoring, model tuning, new use cases

    Deliverables

    Monthly results report, ongoing improvement, priority support

  • Nothing launches below the bar; results are reviewed monthly after launch
  • On site for alignment and launch; remote operation after that
  • Each use case is quoted on its own — never billed by the person-day

Questions

Will our data leave the company?

By default everything is deployed privately — models and data stay on your own servers, and external model APIs can be disabled in one step. A dedicated or government cloud of your choice also works.

Do we need to buy GPU servers first?

Not necessarily. The PoC can run in our demo environment on de-identified material; once results are confirmed, we size compute to the use case, starting from consumer-grade GPUs.

How soon will we see results?

A half-day workshop, a PoC proposal within a week, the PoC in 2–4 weeks; after acceptance, production in 4–6 weeks.

How many of our people are needed?

One business owner and one IT contact. During the PoC you provide real material or data samples and take part in reviews.

What if the model gets it wrong?

Key figures are computed by code, and the model only understands and explains. Answers carry their sources so they can be checked, and high-risk actions always need human approval.

Can it connect to our existing systems?

Yes. Connectors reach ERP, OA, drawing vaults, file shares and business databases — read-only where possible, writes only through deterministic rules and approval.

Can it run on a domestic stack, offline?

Yes. It runs on domestic databases and ARM servers, with offline installers; install, upgrade and rollback have all been rehearsed.

How is it priced?

Per use case: the PoC as a project, delivery as implementation plus licence, operations as an annual subscription. We don't bill by the person-day.

Can you do something that isn't on the list?

Yes. The list covers common use cases; our delivery is tailored to each client anyway. Start with a half-day workshop to pin down the need and the acceptance metrics.

Start with a half-day workshop

Your business owner and IT lead join us to pin down 1–3 candidate use cases and their success metrics.

Book a use-case workshop
  1. 1

    Use-case workshop

    Half a day, on site or online

    • Business owner and IT lead attend
    • Map 1–3 candidate use cases and the state of the data
    • Output: use-case list and draft success metrics
  2. 2

    PoC proposal

    Within a week of the workshop

    • Data and system boundaries, evaluation-set design
    • Milestones, commitments on both sides, acceptance bar
    • Output: a PoC proposal ready to sign
  3. 3

    Run the PoC

    2–4 weeks

    • Your real material, in a private or demo environment
    • Weekly check-ins with visible metrics
    • Output: evaluation report and launch plan